Equipment needed for the Main building:
Toilets
Sinks
Showers
Kitchen sink
Cabinets
Electric stove
Medical Equipment
Foundation: hired local labor, gravel and sand sublayer, local stone, mud/sand slip to fill
space between stones.
Earthen Floors: adobe "pavers" (4" x 16" x 16") stabilized with mud/sand slip
Plastering: adobe earthen plastering and lime stucco plastering
Straw Bales: 310 new construction grade bales from local wheat fields.
Heating: in-floor/slab hydronic radiant system using existing components (domestic electric
water heater as support system, manifold system and pumps, Thermomax solar hot
water collectors to be installed on roof), hot water tubing.
Cooling: passive, chimney effect. cool water piping from underground water resevoir.
Water System: use rain catchment system, storage tank, pump and pressure tank
Electric System: use PV system (solar fabric, battery bank, and inverter)
Septic System: water treatment center for gray water, black treatment off site.