Artux Equipment

Page history last edited by PBworks 16 years, 5 months ago

Equipment needed for the Main building:

 

 

Toilets

 

Sinks

 

Showers

 

Kitchen sink

 

Cabinets

 

Electric stove

 

 

Medical Equipment

 

 

Foundation: hired local labor, gravel and sand sublayer, local stone, mud/sand slip to fill

    space between stones.

 

 

Earthen Floors: adobe "pavers" (4" x 16" x 16") stabilized with mud/sand slip

 

Plastering: adobe earthen plastering and lime stucco plastering

 

 

Straw Bales: 310 new construction grade bales from local wheat fields.

 

 

Heating: in-floor/slab hydronic radiant system using existing components (domestic electric

    water heater as support system, manifold system and pumps, Thermomax solar hot

    water collectors to be installed on roof), hot water tubing.

 

 

Cooling: passive, chimney effect. cool water piping from underground water resevoir.

 

 

Water System: use rain catchment system, storage tank, pump and pressure tank

 

 

Electric System: use PV system (solar fabric, battery bank, and inverter)

 

 

Septic System: water treatment center for gray water, black treatment off site.

 

 